The client was having an extensive refurbishment. Their apartment was already well insulated but the addition of triple glazed windows combined with the lack of air circulation made it unbearable.
Their builder, who was familiar with it from previous projects, recommended HomeKube.
The client thought having air conditioning installed was a major project. However, unlike the MVHR system the client had in their previous apartment there was no massive ductwork or ugly trunking.
The new bathroom took their plumber nearly two weeks to tile and install, whereas the new HomeKube air conditioning system using micro-piping cables was completed in two and a half days providing climate control and air filtration for the master bedroom, children’s rooms and kitchen/diner.